中文 | English
About us | Principle | Solutions | Policy | Career | Investors
Energy Saving
GSHP Principle
Core Technology
Energy Comparison
  Service line:
(86-21)66520666
Your satisfaction is our aim
Your location:Home > Energy Comparison
Energy Comparison
Nobao Green Energy Saving GSHP Central Air Conditioning System Traditional Central Air Conditioning System Solution
Upfront Investment Invested by Nobao Group and saved tremendous upfront investment for customers Large upfront investment, the cost per square meter is 350-400RMB

Depreciation of Equipment

Undertaken by Nobao Group

Annual depreciation rate is 10%

Function Integrated system for heating,cooling,free hot water,floor heating and heating swimming pool services Need multiple different system to realize
Secondary Investment lifespan is 25 years and no need of secondary investment Same as the preliminary investment:350 RMB per m2
Operation Energy Consumption High efficiency, low energy consumption, saving 50%-70% energy compared with traditional system High energy consumption,low efficiency,oil-fired boiler.the cost for coal and gas is increasing
Maintenance Cost Nobao responsible for all the maintenance work within the energy management contracting period High maintenance cost
Maintenance Personnel 1-2 personnel 8-10 personnel
Daily Operation Maintenance Auto operation, free of maintenance VRV air-conditioning system:Refill the refrigerant every 6-7 years,risk of outside window maintenance,vulnerable external cleanliness,boiler system needs professional taking care of by turns,periodical maintenance and check,high safety risk.
Room Size Small room and low noise VRV air-conditioning system:unit placed outside the room,which affect the building beauty; water chilling unit and boiler room taking large areas
Environment Friendly and Policies No carbon dioxide emission,no noise and vibration; Green energy, improving your brand;Strong government policies support and cash subsidies High energy consumption,and emission,restricted by the regulations,boiler burning(coal,oil,gas, etc.) polluted environment.cooling tower creates noise and water molds pollution; High emission cannot sustain the development;Government penalty for polluting the environment and enforced reconstruction and check risk.

One Time Energy Utilization of Nobao GSHP Heating Mode (outlet water 65℃ at condenser, outlet water 5℃ at evaporator)

Items Power generation and output Combined heat and power generation Heat pump COP Utilization efficiency of the original fuel
Coal-fired power plant + GSHP 0.33   3.9 1.3
Coal-fired thermal power plant+GSHP 0.2~0.3 0.5 3.9 1.2~1.8
Gas-fired power plant +GSHP 0.35   3.9 1.4
Gas and steam combined cycle power plant +GSHP 0.45~0.55   3.9 1.8~2.1

One Time Energy Utilization at Boiler Heating Mode

Items Boiler Efficiency Heat supply pipeline efficiency One Time Energy Utilization
Coal 0.5~0.8 0.7~0.92 0.35~0.73
Gas 0.85~0.94 0.7~0.92 0.60~0.86

Oil

0.8~0.9 0.7~0.92 0.56~0.83
Copyright © 2010 Nobao Renewable Energy Holding Limited 滬ICP備10023623號-1     
(Nobao Renewable Energy Holding Limited Videos Download1 )
Nobao Renewable Energy Holdings Limited Adress:Nobao Building,Lane 4,No.150 Yong He Road.
Zip Code:200072   Tel:(86-21)66520666   Fax:(86-21)66312459
公式规律高手区 燕赵排列七走势图 北京快三投注技巧 山东期货配资银环配资 快乐十分前三走势图 新疆11选5开奖结 内蒙古快三基本 海南环岛赛招标 宁夏11选五遗漏最大 五分彩定位胆怎么玩的 贵州福彩快3游戏规则